For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
Special hydraulic cylinder for static load test, matched use with electric hydraulic pump, displacement sensor, pressure sensor, data acquisition for high-rise building, bridge, wharf, pile foundation engineering testing, including Jiangsu in recent years to complete the dynamic test of pile foundation of Runyang Yangtze River bridge, Wuhan Junshan Yangtze bridge pile foundation dynamic testing, testing Zhejiang Jintang bridge pile foundation, Hubei Ehuang Yangtze River bridge pile integrity test, Hainan Petrochemical 300 thousand tons of oil wharf pile testing, the Guangdong Shantou Nan’ao bridge pile foundation test etc.
Model | Capacity | Lifting Height(mm) | Coll. Height(mm) | Interface Distance(mm) | Distance between coupler and bottom(mm) | O. D (mm) | Plunger Dia. (mm) | Bore Dia.(mm) | Mounting Holes | Working Pressure | Weight | |
Circumferencer | Dia. | |||||||||||
(T) | L | L1 | L2 | L3 | D | D1 | D2 | D3 | 4-M | (MPa) | (kg) | |
KET-JCD-50-125 | 50 | 125 | 263 | 157 | 52 | 132 | 70 | 100 | 70 | M16 | 70 | 23 |
KET-JCD-50-160 | 160 | 298 | 192 | 25 | ||||||||
KET-JCD-50-200 | 200 | 338 | 232 | 31 | ||||||||
KET-JCD-100-125 | 100 | 125 | 291 | 159 | 54 | 172 | 100 | 140 | 110 | M20 | 70 | 44 |
KET-JCD-100-160 | 160 | 326 | 194 | 49 | ||||||||
KET-JCD-100-200 | 200 | 366 | 234 | 54 | ||||||||
KET-JCD-200-125 | 200 | 125 | 321 | 160 | 61 | 244 | 150 | 200 | 160 | M24 | 70 | 99 |
KET-JCD-200-160 | 160 | 356 | 195 | 107 | ||||||||
KET-JCD-200-200 | 200 | 396 | 235 | 118 | ||||||||
KET-JCD-300-200 | 300 | 200 | 427 | 242 | 74 | 315 | 180 | 250 | 220 | 70 | 213 | |
KET-JCD-500-200 | 500 | 200 | 475 | 254 | 93 | 395 | 250 | 320 | 280 | 70 | 393 | |
KET-JCD-600-200 | 600 | 200 | 536 | 266 | 115 | 450 | 280 | 360 | 300 | 70 | 579 | |
KET-JCD-800-200 | 800 | 200 | 577 | 294 | 149 | 550 | 320 | 400 | 380 | 70 | 1068 | |
KET-JCD-1000-200 | 1000 | 200 | 620 | 300 | 174 | 600 | 360 | 450 | 450 | 70 | 1200 |
Synchronous lifting and parallel moving of houses | Synchronous lifting in the maintenance of large electric shovel | Synchronous Lifting in the maintenance of floating crane at 500 ton port |
File Name | Format | Language | Download File |
---|