Intelligent control of synchronous lifting hydraulic system for bearing replacement of Shanghai Lupu Bridge

Under the condition of ensuring that the normal traffic of vehicles will not be affected, the bearing of Shanghai Lupu Bridge will be replaced. In this project, the company's KET-SMTB-12 intelligent control synchronous lifting hydraulic system is used, and 24 sets of KET-RSM-1500 ultra-thin are used. This type of hydraulic jack meets the synchronous lifting requirements on site and realizes 12-point synchronous control.

Synchronous lifting of Lupu Bridge to replace rubber bearings

Synchronous lifting of Lupu Bridge to replace rubber bearings

Normal construction without affecting the normal passage of vehicles

12-point intelligent control synchronous lifting hydraulic system


Post time: Jan-14-2022