Before the building is moved
After the building is moved
Foundation construction after the building is moved
According to the requirements, the original building was located in the middle of the road, blocking the passage of the new road, and it had to be moved to the side of the road. In order to control the settlement of the old and new foundations, the construction party conducted an on-site survey of the building in the early stage, widened and strengthened both sides of the building, and added anti-sinking piles at the bottom to reduce the settlement of the foundation during the moving process. After the building is translated into place, the outsourcing beams around the column and the replacement beams under the wall are retained, and the rest of the upper rail system is cut off to restore the use function of the basement.
According to the requirements, the original building was located in the middle of the road, blocking the passage of the new road, and it had to be moved to the side of the road. In order to control the settlement of the old and new foundations, the construction party conducted an on-site survey of the building in the early stage, widened and strengthened both sides of the building, and added anti-sinking piles at the bottom to reduce the settlement of the foundation during the moving process. After the building is translated into place, the outsourcing beams around the column and the replacement beams under the wall are retained, and the rest of the upper rail system is cut off to restore the use function of the basement.
Synchronous translation of the building is under construction
This large-scale building translation project once again verified the excellent quality of Jiangsu Canete products, and continued to maintain the brilliant achievement of zero failure rate. The hard-working and innovative spirit of Caiente people will never stop.
Post time: Jan-19-2022