For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
Split type hydraulic nut splitter is used in industrial equipment in the open air, high temperature or corrosive environment, there rust corrosion killed, thread bump damage, etc. To remove the nut of the place, usually remove the rust nut is very difficult.
The usual practice is to use (gas) welding nut and bolt together cutoff, but in some special circumstances, some prohibit welding operation. Such as coal mines, coal-fired power plant coal storage, pipeline and high-pressure high-temperature pipelines, etc., replace the nut bolt even more difficult.
Product Description
As a high-tech professional company, we are committed to providing the existing mature, safe and super large components hydraulic synchronous lifting system, sliding system, and a series of construction technology and related professional equipment for customer service which is used to solve the problem that the conventional method is difficult to solve during the installation and construction of the projects.
For different form requirements of customers and projects, we can also provide software, hardware and on-site technical guidance services and other flexible service modes.
Our company has participated in various types of large-scale construction projects in various sectors, has a wealth of practical experience and professional technical service personnel. If you have a requirement of installation scheme design, lifting and installation of special equipment (components), we are undoubtedly the most ideal partner.
Industry Applications
Synchronous lifting of bridge plate in bridge construction.
Synchronous lifting and installation of electric generator.
Synchronous lifting and installation of diesel engine.
Synchronous lifting for wreck salvage.
Synchronous lifting and installation of stadium dome.
Synchronous lifting and installation of large crane in shipyard.
Synchronous lifting and installation of shield machine.
Synchronous lifting and installation of large mining mill.
Box girder twist in high-speed rail construction.
Synchronous lifting and installation of steel structure gallery between two high-rise buildings.
Synchronous lifting and installation of pressure vessel in refinery.
Synchronous lifting and installation of forging equipment.
Technical Parameters
Model |
Rated Working Pressure (MPa) |
Rated Lifting Capacity |
Stroke |
Hole Diameter |
Steel Strand Diameter |
Steel Strand Quantity |
Weight |
KET-TSD-600B |
25 |
618 |
500 |
110 |
17.8 |
4 |
720 |
KET-TSD-750 |
25 |
746 |
500 |
125 |
17.8 |
5 |
925 |
KET-TSD-1000C |
23 |
1000 |
300 |
160 |
15.24 |
10 |
937 |
KET-TSD-1700 |
21.5 |
1700 |
500 |
195 |
17.8 |
12 |
1800 |
KET-TSD-2000F |
25 |
2049 |
300 |
176 |
15.24 |
19 |
1300 |
KET-TSD-2000H |
26 |
2052 |
500 |
240 |
17.8 |
16 |
2250 |
KET-TSD-2300 |
25 |
2300 |
500 |
240 |
17.8 |
16 |
2180 |
KET-TSD-2500 | 25 | 2474 | 500 | 240 | 17.8 | 18 | 2460 |
KET-TSD-3500A | 25 | 3525 | 300 | 225 | 15.24 | 31 | 2000 |
KET-TSD-3500C | 27 | 3585 | 500 | 290 | 17.8 | 23 | 3600 |
KET-TSD-4500A | 25 | 4500 | 400 | 300 | 17.8 | 31 | 3980 |
KET-TSD-6000A | 25 | 6126 | 400 | 405 | 17.8 | 42 | 6830 |
KET-TSD-9000 | 24.5 | 9113 | 500 | 480 | 17.8 | 66 | 15000 |
<!–
–>
File Name | Format | Language | Download File |
---|